Ford FLTM BO160-04涂塑料部位高压清洗作业性

Jet position Perpendicular to specimen
Water temperature 70 °C +/- 2 °C
Distance of nozzle to specimen 50mm +/-3mm
Water pressure 3000 +/-50 kPa
Testing time 60  +/- 3 seconds
Water flow rate 420 litres/hour minimum

 
 Method B, moving jet.

 Jet position   Perpendicular to specimen
Water Temperature 80 °C +/- 4 °C
Distance of nozzle to specimen 100 mm +/-3mm
Water pressure 6000 +/-50 kPa
Moving range 30mm +/- 10 mm from center,total traverse 60mm
Moving cycle 60 cycle/minute
Moving direction  parallel to the X scribe on the specimen
Jet position Perpendicular to specimen
  (The lines of the X scribe are Northeast to Southwest.  The longer axis of the spray fan pattern is East-West, and the direction of movement is North-South.)
Testing time 120 seconds, +/-3 seconds
Water flow rate 610 litres/hour minimum
Note: The water pressure and water temperature settings must be measured immediately behind the nozzle

 
Conditioning and Test Conditions
All test values indicated herein are based on material conditioned in a controlled atmosphere of 23 +/- 2 °C and 50 +/- 5% relative humidity for not less than 24 h prior to testing and tested under the same conditions unless otherwise specified.
Procedure
 1. The equipment is filled with water without any additional cleaning agents and heated.
 2. Before testing the equipment must be adjusted to the required test pressure for the specified distance.
 3 Scribe the panel with an X scribe, over the whole area to be exposed to the water jet.
 4. The gun with the nozzle is fixed to the required distance from the nozzle to the painted surface which is to be tested.  The jet of water has to be directed vertically onto the painted surface.
 5. Spray water for the specified length of time.
 6. The surface is dried and evaluated after cooling to 23 +/- 2 °C.
 7. Report any failure (e.g., loss of gloss, loss of adhesion, surface deterioration).  The principal failure mode is paint peeling.
 
 
Chemicals, materials, parts, and equipment referenced in this document must be used and handled properly.  Each party is responsible for determining proper use and handling in its facilities.
 

声明:本站部分文章内容及图片转载于互联 、内容不代表本站观点,如有内容涉及侵权,请您立即联系本站处理,非常感谢!

(0)
上一篇 2019年7月6日
下一篇 2019年7月6日

相关推荐