CETP00.00-L-467实验室大气循环腐蚀盐雾标准2

Fig. 4  Example of open and well drained fixtures for flat test panels (left) and minimum recommended stacking distance of panels (right)
图4 适用于平板试样的开放且排水畅通的夹具(左图);建议***板间距(右图)
 

Table 1.  Climate program, step by step in automated mode
表1  环境表,自动模式的各个步骤

Step
步骤
Time elapsed
耗时
Duration of step 步骤持续时间 Climate settings at start of step
初始环境设定
Comments备注
no h m h m m T (°C) % RH  
1a 0 0 0 10* 50* 70* Spray thoroughly 0.5% NaCl to wet and cool0.5%氯化钠,湿透且冷却
1b 0 10 0 20 30-50 Wet Cool chamber with maximum capacity
*大限度冷却试验箱
1a’ 0 30 0 3 <30 Wet Spray to regain wetness (cooling dries)
通过喷洒使干冷的试验箱再次湿润
1c 0 33 2 27 <30 wet (95) 25±2 to be reached within 1 h from start (1a)
从步骤1a开始,一小时内达到25±2
1a’ 3 0 0 3 25±2 wet Secure and support wetness by spraying
通过喷洒保持湿润
1c’ 3 3 2 54 25±2 wet (95) wet (95) = OK to set to 95% RH
湿度(95)= 可以设置到95%RH
1a’ 5 57 0 3 25±2 wet Defines wet condition before climate control环境控制前明确湿工况
 
2a 6 0 0 30 25±2 wet (95) Start of quick temperature rise without drying 开始快速加温,但不能干燥
2b 6 30 2 00 40±0.61 wet (95) Start of slow drying by diffusion
通过扩散,开始缓慢干燥
3a 8 30 15 30 50±0.61 70±3 Panels shall be free from visible wetness
板上无可见水迹
3a 24 00 50±0.61 70±3 End of “workday” procedure
“工作日”程序结束
Repeat steps 1a – 3a another four times步骤1a-3a再重复4次
3b 120 00 48888 00 50±0.61 70±3 Phase in with weekends in case of manual operations in “workday” procedure
假如“工作日”程序是手动操作,则在各个周末逐步进行
3b 168 00 50±0.61 70±3
Repeat steps 1a-3b for required number of weeks 步骤1a-3b重复次数按各周要求

 
* Provided proceeding from step 3a or 3b假如从3a或3b开始进行

Fig. 5 Workday (Mon.-Fri.) test cycle图5 工作日(一***)试验循环
 

 
Fig. 6 Complete weekly program.图6 完成每周计划
 
5.2.1 Operations within the wet phase at 25±2°C:  
5.2.1  在25±2°C湿润阶段的操作
 
Exposure to 0.50±0.05% NaCl solution shall be performed at least in the beginning, middle and at the end of the 6 h wet phase.  
在6小时湿润阶段的开始、中端和结束时***各进行一次0.50±0.05%的氯化钠溶液曝露。
 
In automated mode, the first event may consist of a longer period of spray (1a – up to 10 minutes) in order to cool the samples and the chamber more efficiently from the 50°C, 70% RH condition. If all test operations are performed within the same climate chamber, it is essential to follow-up with efficient cooling after the first spray event, in order to reach a temperature below 30°C within the first 30 minutes of the wet